Private Client Documentation Checklist

13

Financial Services

2 years ago

This overview outlines the documentation and procedural requirements for managing private client moves, from pre-move consultation to delivery authorization.

Purpose:
Ensure compliance with government regulations, accurate record-keeping, and smooth execution of private client moves.

Key Areas:

  1. Pre-Move Consultation:

    • Scheduling: Conduct within 5 business days of receiving the move order (2 days for rush moves).

    • Documentation: Provide the pre-move booklet to the shipper and obtain their signature.

    • Weight Estimates: Send estimated weight to the government within 2 business days.

    • Communication: Inform the shipper of responsibilities regarding item additions or removals.

  2. Weighing Requirements:

    • Under 7,000 lbs: Use the Government Approved Standard Weight List (SWL); physical scale not required.

    • Over 7,000 lbs: Weigh both light and heavy shipments within 24 hours at the same scale.

    • Documentation: Ensure scale tickets are legible and signed; submit to Atlas Financial Services if net weight exceeds 110% of the estimate or if shipment exceeds 20,000 lbs.

  3. Unpacking Certificate:

    • Mandatory: Required for all government moves and completed during unpacking at destination.

    • Signatures: Obtain signatures from both the member and the crew.

    • Refusal: If the member refuses unpacking, document it and release Atlas from liability for subsequent claims.

    • Submission: Scan and submit the certificate to Atlas Canada within 10 days.

  4. Delivery Authorization:

    • Direct Delivery: Obtain a DDR authorization number for DND and CRS shipments before delivery; RCMP shipments do not require a DDR number.

    • After Hours: For weekend or after-hours deliveries, secure an advanced DDR number during regular business hours.

    • Local Moves: DDR number not required for same-day or next-day moves within the same area.

    • Notification: Inform Atlas Canada Operations and Government Services if delivering before the Guaranteed Time Window (GTW).

Key Takeaway:
Following this checklist ensures proper documentation, regulatory compliance, and accountability throughout the move process, reducing errors and protecting both Atlas and the client.